Load-Bearing Double Flush Beam

Project

Load-Bearing Double Flush Beam

GTA · Steel Flush Beam · 1–2 days

A structural wall between the living and dining rooms removed and the load carried by a steel flush beam set into the ceiling. Zero ceiling drop, one continuous open-concept main floor — start to finish in 1 to 2 days.

After
Before
BeforeAfter
← All projects   Start your project

Let's build

Ready to hand it over?
Let's turn drawings into structure.

Fully insured, WSIB covered, serving the GTA & out of town.

HoursMon–Fri 9–6 · Sat 10–2 · Sun closed
CoverageGTA & out of town
CredentialsFully insured · WSIB covered
Call 647 808 3334