
Project
Load-Bearing Double Flush Beam
GTA · Steel Flush Beam · 1–2 days
A structural wall between the living and dining rooms removed and the load carried by a steel flush beam set into the ceiling. Zero ceiling drop, one continuous open-concept main floor — start to finish in 1 to 2 days.


BeforeAfter
