Load-Bearing Wall

Portfolio · 3 projects

Load-Bearing Wall

Open-concept transformations carried by steel and LVL beams — flush or dropped, safely to code. Drag any slider to reveal.

Open Concept — Steel Flush Beam

GTA · Steel flush beam · 1–2 days

A structural wall between the living and dining rooms removed and the load carried by a steel flush beam set into the ceiling — zero ceiling drop, one continuous open-concept main floor.

After
Before
BeforeAfter

Main-Floor Load-Bearing Removal

GTA · Steel beam · 1–2 days

A main-floor bearing wall opened up and re-supported on a new engineered beam, with temporary shoring carrying the structure throughout the removal.

After
Before
BeforeAfter

Load-Bearing Wall Removal

GTA · Steel beam · 1–2 days

A closed main floor opened into a single connected space — wall removed, beam installed to engineering, and the ceiling closed back up clean.

After
Before
BeforeAfter

Let's build

Your project
could be next.

Fully insured, WSIB covered, serving the GTA & out of town.

HoursMon–Fri 9–6 · Sat 10–2 · Sun closed
CoverageGTA & out of town
CredentialsFully insured · WSIB covered
Call 647 808 3334